About the module

Krinkle ESA Phase I - O&G provides its users with all the forms necessary to perform a comprehensive Environmental Site Assessment (ESA Phase I) at any former Oil & Gas site.

The system allows users to document (with GPS and fully tagged photos) the site’s signage, its approach characteristics, land uses, weeds and vegetation, environmental concerns (APECs), tanks, wellheads with pressure testing, topography, hill cuts, wetlands (with estimated area math), and much more. Even a site sketch system is included which can either capture handwritten and photographed sketches or allow the user to draw directly on an overhead satellite image using a stylus.


Run Standard And Custom Reports At The Touch Of A Button

Advanced Reporting Capabilities

Krinkle Environmental® and its ESA Phase I & ABC Modules include an easy to read set of reports, which any report recipient would find complete and concise. They can even be customized with your company’s name and logo. Although custom reports are rarely needed in Krinkle’s products, they can be created quickly upon request. While the data collection effort is typically non-linear, our professional reporting system automatically organizes the data for easy viewing.

Click the button below to see a close-up example of the well-organized and easily viewed ESA Phase 1 Oil & Gas report. If you would like to receive a full example of this report, press the contact us button below and request a full PDF copy in the comments section.

Download ESA Report

Click Image to Enlarge

Keep Users Connected with their Data

An Intuitive Design for Complex Processes

Our ultra-intuitive user interface design makes training quick, makes data entry quick and ultimately keeps your users deeply organized, connected to their data, and highly efficient. No one wants field employees to spend too much time documenting so we've designed the software to be as user-friendly as possible.

Click Image to Enlarge

Data Visibility At Your Fingertips

Google Earth and ESRI Compatibility

Krinkle ESA Phase I – O&G is fully integrated to Google Earth, which allows users to easily and quickly create a geospatial view of user work (“Work Crumbing“ and “Bread Crumbing”) as well as the locations of the individual assets they identified during their work (environmental concerns, wetlands, hill cuts, tanks, etc.). The data can be saved as a file (.KMZ and .KML file formats) from our secure reporting portal and viewed on Google Earth. They can also be converted to ESRI Shape Files.

Click the image to see a close-up of what Google Earth looks like.

Comprehensive Proof-of-Work

Date, Time and GPS Stamped Photos

All photos that are taken within Krinkle ESA Phase I – O&G are automatically stamped with the date, time, GPS position, user and client as well as other “proof-of-work” elements specific to the photo taken. Incorporating “proof-of-work” photos into all your documentation illustrates every aspect of a future auditor’s questions, making your organization fully audit-ready. While Krinkle ESA Phase I – O&G® has the ability to collect your GPS location straight from your mobile device (iOS/Android), it also supports allowing you to enter external, high precision GPS positions (from Trimble devices for example) if your data requires that level of accuracy.

Click Image to Enlarge

Click Image to Enlarge

We Work The Way You Work

Guided Process with Non-Linear Data Capture

Krinkle Environmental® and all its modules were built with the idea of keeping your end-users efficient with their time, thorough in their data collection, and guided step-by-step through their work. This ensures accuracy, completeness and speed while collecting data. While the system acts as a guided process, it does not limit its users by forcing them to complete their work in a specific order. The app demonstrates incredible flexibility by allowing field workers to fill out forms and assess the site in the quickest/most efficient order for that particular site/project. For example, as opposed to completing all wetlands forms at once, and then moving on to complete all of the hill-cut forms at once, the user can decide which forms to complete at what time (typically determined by their geographic location and the surrounding land). This drastically speeds up the site assessment process and significantly reduces the data collection burden.

A Complete, Yet Flexible, Package

Use as a Stand-Alone System or Integrate Into Your Existing Systems

Krinkle ESA Phase I – O&G stands on its own and requires no other system to get your operation functioning. Like all products from Krinkleapps.com, it can also be integrated with other systems if ever required, due to its comprehensive set of RESTful APIs.

Click the button below to learn more about our RESTful APIs.

Visit our API page

Enterprise-Class Data Security

We know that the information collected within this industry is extremely sensitive and data security is a top priority. Krinkle ESA Phase I – O&G is extremely secure and our security practices have been implemented and tested for years. For those looking for more technical information, Krinkle uses SSL certificates signed with a 2048-bit RSA and hashed SHA-256. Additionally, Krinkle applications only communicate using newer secure TLS protocols with HSTS, and an AES-256 cipher suite. Data is fully encrypted on the local device, and in transit to the servers. The servers are secure at Amazon’s secure data centers behind their tightly managed firewalls.

Easy to Train, Learn and Deploy

Krinkle ESA Phase I – O&G is easily trained, learned and used by your employees and/or contractors. We include thorough initial training classes (even though they rarely exceed 60-90 minutes!) and ongoing user support in our pricing. The system even supports service companies that employ layers of subcontractors beneath them to support their ultimate client. The system’s flexibility to operate in many unique business models, no matter how distributed, is unrivaled.

Schedule a Demo

Krinkle Environmental® and all its associated application modules (e.g. Krinkle ESA Phase I – O&G) are designed to manage and simplify your many environmental projects. If you are interested in learning more about how Krinkle ESA Phase I – O&G could help your process, please click below to set up a free demo.

Free Demo

$1,500

One-Time Setup Fee with Access to All Krinkle Environmental Modules

Includes 4 Hours of Field User and Admin Training.

Contact Us Now

$60

Per ESA Project

Includes Unlimited Users, Unlimited Reports, and User Support.

Schedule Demo